Skip to the main text
Independent, no advertisingWritten for the United StatesUpdated 20/08/2026

Malandracia

Practical guides to the house, the yard and the systems that fail in them.

Guides to the parts of a house that are expensive to get wrong: ground that has to be held back, water that has to be sent somewhere, floors that have to survive a chair, and buried pipe that only announces itself once. Every page names the standard or the code section it leans on, and none of them quote a price.

Tape measure, spirit level, cordless drill and a pair of work gloves laid out on a scuffed timber workbench
Most of what follows is decided before any of this comes out of the bag: the base, the drainage, the order of the work.

Yard & hardscape

How to Build a Dry Stack Big Block Retaining Wall

A dry stack wall has no mortar. It holds soil back with mass, with friction between courses and with a deliberate lean into the hill. Nearly every failure comes from the two parts nobody photographs: the compacted levelling pad underneath, and the drainage stone behind.

The full sequence is here, from the 811 call to the cap adhesive, along with the height at which the job stops being a weekend project and becomes an engineered structure.

Read the build sequence

Yard & hardscape

Everything outside the walls that has to hold ground, shed water or stay put.

Inside the house

Floors and finishes, judged on what they do rather than how they photograph.

Drains & sewers

The buried system that only gets attention once, and the decisions that make that once permanent.

Roof & openings

The envelope: the two purchases that cost the most and get the least scrutiny.

Planning & budget

The order of operations, which is the only part of a budget that is free to get right.